Do You Know the Top 15 Things to be Aware of for High-rise Building Formwork Support?

News

Do You Know the Top 15 Things to be Aware of for High-rise Building Formwork Support?

  • Categories:Group News
  • Author:
  • Origin:
  • Time of issue:2018-06-09 00:00
  • Views:

(Summary description)The details of the brace (note: the bracing does not form a 135°hook) 2. The details of the standard at the bottom of the board and the upper ledger 3. Workers splicing the wall column formwork (Note: There is no sponge strip for the formwork joints, which is easy to cause grout leakage) 4. Reinforcement measures for horizontal pipes in the short direction of the shear wall 5 Shear wall braces between steel bars (precast concrete braces are used, note: the braces are not arranged in a plum blossom shape)

Do You Know the Top 15 Things to be Aware of for High-rise Building Formwork Support?

(Summary description)The details of the brace (note: the bracing does not form a 135°hook)
2. The details of the standard at the bottom of the board and the upper ledger 3. Workers splicing the wall column formwork (Note: There is no sponge strip for the formwork joints, which is easy to cause grout leakage) 4. Reinforcement measures for horizontal pipes in the short direction of the shear wall 5 Shear wall braces between steel bars (precast concrete braces are used, note: the braces are not arranged in a plum blossom shape)

  • Categories:Group News
  • Author:
  • Origin:
  • Time of issue:2018-06-09 00:00
  • Views:
Information

  1. The details of the brace (note: the bracing does not form a 135°hook)

2. The details of the standard at the bottom of the board and the upper ledger

3. Workers splicing the wall column formwork (Note: There is no sponge strip for the formwork joints, which is easy to cause grout leakage)

4. Reinforcement measures for horizontal pipes in the short direction of the shear wall

5 Shear wall braces between steel bars (precast concrete braces are used, note: the braces are not arranged in a plum blossom shape)

6. The large opening between the shear wall strengthens the support

7. Strengthen the width of the shear wall

8. The vertical reinforcement of the double-wood square at the joint of the vertical formwork of the shear wall

9. The details of the vertical poles at the bottom of the slab and the upper horizontal poles (Note: In the formwork support scheme, the vertical keels are generally arranged at a distance of 300. In fact, for the wooden formwork, it is different from the stereotyped formwork. It must be reinforced by two vertical keels on both sides of the joint. Ensure the verticality and stability of the wall.)

10. The beam and slab support system, the beam is tightly spaced at 500 steps (note: the bottom of the U-shaped support does not see the vertical and horizontal horizontal rod constraints)

11. The method of plugging the bottom mouth of the wall formwork

12. Vertical reinforcement system for wall column formwork (vertical use of wooden square vertical placement, horizontal use of double steel pipe back pipes)

13. Vertical wood spacing

14. Horizontal horizontal tube step distance, 200mm in one step, 500mm in two steps

15. The wall formwork is drilled to the pull screw (Note: The general plan is to pull the pull screw through and reinforce it, but everyone found no. If the wall is too long, it is too wasteful to use the full length to pull the pull screw, so the workers came up with a way, yes The pull screw and butterfly buckle pull a fastener, and the fastener is fastened on the steel pipe in the other direction, which is a good way to strengthen the small wall.